Network Help

isurutmv

Well-known member
  • May 1, 2013
    1,936
    823
    113
    29
    Gampaha
    Hypothetical Case Study Details
    A software development company is having the following working groups.
    1. System designers and developers who work in-house using the computers that are
    connected to the local area network. (200 workstations)
    2. A remote team working at different location but they are connecting with the main sever
    through the public network. (75 remote users)
    3. A group of developers working at a remote location in the same country who connect to the
    sever from their own devices (using BOYD).
    4. A Team of consultants are working with company on request and connect to the local area
    network using their own devices.
    5. Several stakeholders who evaluate their product logging in to the system repository from
    foreign USA and UK.
    6. Backups finalized products will store in cloud sever in foreign locations.
    The total number of users from different categories is up to 500. There are 200 hundred local
    internal system required and up to 75 users in the remote location of the same country who are
    connecting through the public network.


    mata meke network diagram eka hadala dennako kawuru hari :rolleyes::rolleyes::rolleyes: