Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Baseus PI LITE INDOOR CAMERA
ErMurazor
Updated:
Today at 12:26 PM
Ad icon
Colombo
Hard Disk For Sale
mazza
Updated:
Saturday at 10:23 PM
land for sale
justasking
Updated:
Saturday at 9:32 AM
AMD AM 5 Ryzen setup
prabodhamadusanka
Updated:
Thursday at 12:56 PM
Gampaha
ACER OKW223 Wired RGB Keyboard
chint
Updated:
Thursday at 10:17 AM
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
News
New rail carriages from China by nxt month
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="saraprobe" data-source="post: 719151" data-attributes="member: 13914"><p><img src="http://i16.tinypic.com/61nmgrq.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>The compartments, each costing 22 million rupees, will leave the Darley Harbour in China. This will fulfil a long-felt need of the Sri Lanka Railway Service. Not a single rail coach was newly added to service after 1982. As such, Minister Dulles Alahapperuma adopted measures to get down the coaches. It was his first cabinet memorandum. The coaches had been produced according to standards certified by Sri Lankan Railway Engineers. The supply agent is bound to pay 50 US Dollars per day, if any coach had to be removed from service during the warranty period due to any fault. This is the first time in Sri Lanka’s railway history that such a condition has been agreed upon. The Minister emphasised that it is a major victory for the government. The first 25 coaches are due to reach the Colombo Harbour on the 03rd of September. The balance 75 will be added to service within the next three months.</p><p></p><p>Watch video,</p><p></p><p><a href="http://www.itn.lk/news_09_20070731.html" target="_blank">Rail </a></p></blockquote><p></p>
[QUOTE="saraprobe, post: 719151, member: 13914"] [img]http://i16.tinypic.com/61nmgrq.jpg[/img] The compartments, each costing 22 million rupees, will leave the Darley Harbour in China. This will fulfil a long-felt need of the Sri Lanka Railway Service. Not a single rail coach was newly added to service after 1982. As such, Minister Dulles Alahapperuma adopted measures to get down the coaches. It was his first cabinet memorandum. The coaches had been produced according to standards certified by Sri Lankan Railway Engineers. The supply agent is bound to pay 50 US Dollars per day, if any coach had to be removed from service during the warranty period due to any fault. This is the first time in Sri Lanka’s railway history that such a condition has been agreed upon. The Minister emphasised that it is a major victory for the government. The first 25 coaches are due to reach the Colombo Harbour on the 03rd of September. The balance 75 will be added to service within the next three months. Watch video, [url=http://www.itn.lk/news_09_20070731.html]Rail [/url] [/QUOTE]
Insert quotes…
Verification
Haya warak paha keeyada? (haya wadi kireema paha)
Post reply
Top
Bottom