Bought this inverter and planning to install it tomorrow, so few questions any directions appriciated
https://powmr.com/products/6500w-220vac-24vdc-hybrid-inverter-charger
1. Should i bond the Neutral and Ground of the Inverter output (with a separate Earth rod)
2. Planning to keep it like a UPS (going to charge during off peak hours 10.30 pm - 5.30am and going to run on full inverter during peak 6.30 - 10.30pm , and day time on grid / bypass mode, and later going to add solar panel
usually do you guys run the inverter 12 hrs (daytime) on grid tie systems
any other points to look out for
https://powmr.com/products/6500w-220vac-24vdc-hybrid-inverter-charger
1. Should i bond the Neutral and Ground of the Inverter output (with a separate Earth rod)
2. Planning to keep it like a UPS (going to charge during off peak hours 10.30 pm - 5.30am and going to run on full inverter during peak 6.30 - 10.30pm , and day time on grid / bypass mode, and later going to add solar panel
usually do you guys run the inverter 12 hrs (daytime) on grid tie systems
any other points to look out for