සංවර්ධන News

monson

Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    Kottawa-Makumbura Multi-Modal Transport Hub construction progress - 17.01.30

    IMG_20170130_163401b.jpg
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    Rs.10b JICA loan for landslide protection awarded

    By Uditha Jayasinghe

    Two local companies have been selected to increase landslide protection of the national road network under a Rs.10 billion loan from the Japan International Cooperation Agency (JICA).

    A joint venture between RR Construction and Soltec, along with the State Development and Construction Corporation, were given two projects to build landslide protection of the road network in two provinces.

    The JICA loan, which was initially received in 2013 under the previous Government was given Cabinet approval the same year, according to the Cabinet paper seen by the Daily FT. As part of the loan, two contract packages for civil works were outlined and tenders were called in 2016. Under the first package, ten locations in the Central, Uva and Sabaragamuwa Provinces were selected to be protected from landslides while the second package covered six locations in the same Provinces.

    Five companies bid for the projects including Japanese company Wakachiku Construction, which had also bid for the controversial third section of the Central Expressway. A second Japanese company Taisei Corporation, that is the forerunner to winning the Central Expressway contract, had also submitted a bid according to the Cabinet paper signed by Higher Education and Highways Minister Lakshman Kiriella.

    Local companies Maga Engineering and State Development and Construction Corporation also submitted bids along with RR Construction, which joined with Soltec Ltd. in a joint venture. The Technical Evaluation Committee (TEC) considered the financial proposals of all the bids and selected State Development and Construction Corporation to construct landslide protection for the first package at a cost of Rs.760 million and $ 14 million while the joint venture between RR Construction and Soltec was given the second package at Rs. 2.1 billion. The Cabinet paper shows that the bid made by Taisei Corporation for the second package was more than three times higher than what was made by the local joint venture. Taisei has bid Rs. 159 billion to construct the third phase of the Central Expressway, according to reports, which is higher than the Rs. 147 billion bid submitted by Fujita Corporation. However, the Government is only studying the bid made by Taisei Corporation.

    - http://www.ft.lk/article/594680/Rs-10b-JICA-loan-for-landslide-protection-awarded
     

    KDH

    Well-known member
  • Jul 4, 2014
    18,309
    8,415
    113
    රූකඩ රාජ්ජේ
    අට පාස් නැහැකියූ මුසම්මිල් වැඩබාරගනී.

    z_p-13-Let%E2%80%99s-make-01.jpg


    පසුගිය දිනවල මහත් අන්දොලනත්මකව කරලියට පිවිසි මුසම්මිල් දැන් මැලේසියාවේ ස්ථානගතවී ඇත.
    නීතිඥයන් පිරිසක් නඩුමගට පිවිසුන බවද ආරංචිවුනි.
    සියලු දේ තම්බයකටවත් මායිම් නොකළ ආණ්ඩුව ඔහු තවත් දේශපාලන අතකොළුවක් කරමින් තානාපති පුටුවකට පත්කර යවා ඇත.
    මහින්දගේ පිළිවෙල විවේචනය කල, මොන්ගලයා, පොළොන්නරුවේ ගොවි රජානෝ, සොටු අම්මණ්ඩි සහ පොනිල් නියම යහපාලන පිළිවෙතම අනුගමනය කරමින් දේශපල්ලනයෙන්, අධ්‍යාපනයෙන් පිරිපුන් පොරක් තානාපති කර ඇත.

    :lol::lol::lol::lol::lol::lol:
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    Prime Minister Ranil Wickremeisnghe declared open an Ante LECO Smart metering Company in Bandaragama yesterday.

    16298663_1271631639539551_710761493477908755_n.jpg

    16299512_1271631636206218_2635291747457353312_n.jpg

    16114760_1271631749539540_8884272916404619825_n.jpg
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    ජාතික දන්ත (ශික්ෂණ) රෝහලේ පළමු අදියරේ නව මහල් ගොඩනැගිලි සංකීර්ණය විවෘත කිරිමේ සහ එහි දෙවන අදියරෙහි ගොඩනැගිල්ල සදහා මුල්ගල තැබීමේ උත්සවය අද(31) පෙරවරුවේ ජනාධිපති ගරු මෛත්‍රීපාල සිරිසේන මැතිතුමාගේ ප්‍රධානත්වයෙන් පැවැත්විණි.

    රුපියල් මිලියන 1200 කට ආසන්න වියදමකින් යුත් මහල් නවයකින් සමන්විත නව ගොඩනැගිලි සංකීර්ණය ජනතා අයිතියට පත්කිරීම වෙනුවෙන් වූ සමරු ඵලකය නිරාවරණය කළ ජනාධිපතිතුමා නව පරිගණක මෘදුකාංගය හරහා ප්‍රථම රෝගියා ද ලියාපදිංවි කරවීය.

    රෝහලේ ඒකක නිරීක්ෂණය කළ ජනාධිපතිතුමා අනතුරුව මහා සංඝරත්නයේ සෙත් පිරිත් මධ්‍යයේ රෝහලේ දෙවන අදියරේ ඉදිකිරීමට නියමිත මහල් නවයකින් සමන්විත ගොඩනැගිල්ල සදහා මුල් ගල තැබීය.


    16427236_10154801974326327_5551545338116331012_n.jpg

    16425945_10154801973491327_2795127992543264410_n.jpg

    16298749_10154801968211327_3575099535752191337_n.jpg

    16406698_10154644668634130_7593256276059807342_n.jpg


    - https://www.facebook.com/maithripalas/posts/10154801971466327
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    Finishing touches to Lotus Tower by 2018: TRCSL

    Published : 10:05 am January 31, 2017

    By Darshana Sanjeewa

    With construction work of the Lotus Tower drawing to an end, the finishing touches on the interior of the structure would be completed by 2018, the Telecommunications Regulatory Commission of Sri Lanka (TRCSL) said yesterday.

    DM_20170131_A004-8.jpg


    Speaking to the Daily Mirror, Project Director W.D. de Alwis said the construction of the main structure was completed and that work on the petals of the lotus flower would commence in a fortnight.


    He said the petals which were assembled in another location had been transported to Colombo, and that they would be attached to the tower in two weeks time.


    ‘‘We have finished a major part of the construction and hope to stick to our schedule of completing everything by October this year. However, we have to complete the interiors of the building for businesses and hotels that would be housed, and it will take at least two to three months more than what was initially anticipated,” he said.


    The tower, originally scheduled to be completed by October 2017, is expected to house telecommunication antennas, offices and other recreation providers. Once completed, it will stand tall as the tallest building in Sri Lanka and South Asia with a height of 350 metres.

    The construction of the tower cost a staggering USD 104 million, with eighty per cent of the cost borne by the EXIM Bank of China.
    Further, the tower is said to have a telecommunication museum, restaurants, supermarkets, food courts, conference halls with seating for 400 people, a 1,000-seat auditorium, luxury hotel rooms, ballrooms and an observation gallery.


    However, the construction work of the tower came to a standstill in 2015 when Ports and Shipping Minister Arjuna Ranatunga claimed that the land on which the building was put up belonged to the Sri Lanka Ports Authority and that it had not been acquired through proper legal means.


    Constructed on a 10-acre land, the tower is to be a hot spot for communication, office spaces, malls and parks. Vehicle parking facilities are to be provided in the first few floors, while the upper floors are exclusively for telecommunication purposes.


    However, under phase two of the project, plans are underway to construct a theme park, shopping mall and vehicle park.

    - http://mirrorcitizen.dailymirror.lk/2017/01/31/finishing-touches-to-lotus-tower-by-2018-trcsl/
     
    Last edited:

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    The commencement of rehabilitation of the Warapitiya - Malgahamulla Road in the Kundasale Electorate, Kandy.

    16298891_1215131481906474_1683856479072103058_n.jpg
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    ශ්‍රී ලංකා මාර්ග සංවර්ධන අධිකාරිය සඳහා මූල්‍ය පහසුකම් සැපයීම

    - ප්‍රදේශ අතර සම්බන්ධතාව වැඩිදියුණු කරමින් රටෙහි ආර්ථික ක්‍රියාකාරකම් ප්‍රවර්ධනය කිරීම සඳහා වන ප්‍රමුඛ ව්‍යාපෘතීන්ගෙන් එකක් ලෙස මධ්‍යම අධිවේගී මාර්ග ව්‍යාපෘතිය රජය විසින් හඳුනාගනු ලැබ ඇත. ඒ අනුව, මධ්‍යම අධිවේගී මාර්ග ව්‍යාපෘතියේ දෙවන (II) කොටස ඉදි කිරීම සඳහා මාර්ග සංවර්ධන අධිකාරියට (RDA) අවශ්‍ය රුපියල් බිලියන 23.2ක අරමුදල්, ජාතික ඉතිරි කිරීමේ බැංකුවෙන් සහ මහජන බැංකුවෙන් ණය පහසුකම් ලෙස සලසා ගැනීම සඳහා අවශ්‍ය කටයුතු සිදු කිරීම පිණිස මුදල් අමාත්‍ය රවි කරුණානායක මැතිතුමා ඉදිරිපත් කළ යෝජනාව අමාත්‍ය මණ්ඩලය විසින් අනුමත කරන ලදී.

    'සුඛිත පුරවර' නගර සංවර්ධන වැඩසටහනට අයත් ව්‍යාපෘති 2017 වර්ෂය තුළ තවදුරටත් ක්‍රියාත්මක කිරීම සහ නව ව්‍යාපෘති ආරම්භ කිරීම

    - මහානගර හා බස්නාහිර සංවර්ධන අමාත්‍යාංශය විසින් මුළු දිවයිනම ආවරණය වන පරිදි ක්‍රියාත්මක කරනු ලබන 'සුඛිත පුරවර' නාගරික සංවර්ධන වැඩසටහන යටතේ 2016 වසර තුළ ව්‍යාපෘති 64ක ඉදි කිරීමේ කොන්ත්‍රාත්තු ප්‍රදානය කරනු ලැබ තිබේ. විවිධ සාධාරණ හේතු නිසා 2016 මූල්‍ය වර්ෂය අවසන්වීමට පෙර සම්පූර්ණ කළ නොහැකි වූ ඉන් ඇතැම් ව්‍යාපෘති සහ 2017 වර්ෂය සඳහා හඳුනාගනු ලැබ ඇති නව ව්‍යාපෘති 2017 මූල්‍ය වර්ෂය තුළ ක්‍රියාත්මක කිරීම පිණිස මහානගර හා බස්නාහිර සංවර්ධන අමාත්‍ය පාඨලී චම්පික රණවක මැතිතුමා ඉදිරිපත් කළ යෝජනාව අමාත්‍ය මණ්ඩලය විසින් අනුමත කරන ලදී.

    හසලක ජල සම්පාදන ව්‍යාපෘතිය ක්‍රියාත්මක කිරීම

    - හසලක ජල සම්පාදන ව්‍යාපෘතිය මඟින් ග්‍රාම නිලධාරි කොට්ඨාස 33 ක් ආවරණය කරමින් නව නළ ජල සබඳතා 12,500ක් ලබා දීමට අපේක්ෂා කරනු ලබන අතර, එමඟින් 49,370ක පමණ ජනතාවකට සෙත සැලසෙනු ඇත. ආර්ථික කළමනාකරණය පිළිබඳ අමාත්‍ය මණ්ඩල කාරක සභාවේ සහ අමාත්‍ය මණ්ඩලය විසින් පත් කරන ලද ස්ථාවර ප්‍රසම්පාදන කමිටුවේ නිර්දේශය පරිදි හසලක ජල සම්පාදන ව්‍යාපෘතිය ක්‍රියාත්මක කිරීම පිණිස නගර සැලසුම් හා ජල සම්පාදන අමාත්‍ය රවුෆ් හකීම් මැතිතුමා ඉදිරිපත් කළ යෝජනාව අමාත්‍ය මණ්ඩලය විසින් අනුමත කරන ලදී.

    අධිකරණ සඳහා නව ගොඩනැඟිලි පහසුකම් ලබා දීම

    - දැනට පවතින අධිකරණ ගොඩනැඟිලි ඉතා පැරණි ඒවා වීම, ජනගහනය ඉහළ යාමට සාපේක්ෂව නඩු සංඛ්‍යාව ඉහළ යාම සහ එම තත්ත්වය සැලකිල්ලට ගැනීමේදී අධිකරණ ගොඩනැඟිලිවල පවතින ඉඩ පහසුකම් ප්‍රමාණවත් නොවීම වැනි හේතු මත නව අධිකරණ ගොඩනැඟිලි ඉදි කිරීම අවශ්‍ය වේ. ඒ අනුව, ගම්පොළ, රුවන්වැල්ල, මාන්කුලම්, මුලතිවු, යාපනය, අනුරාධපුරය හා පොළොන්නරුව යන ප්‍රදේශවල පවතින අධිකරණ ගොඩනැඟිලි ඉදි කිරීමට ප්‍රමුඛතාව ලබා දෙමින් නව අධිකරණ ගොඩනැඟිලි ඉදි කිරීම පිණිස අධිකරණ අමාත්‍ය (ආචාර්ය) විජයදාස රාජපක්ෂ මැතිතුමා ඉදිරිපත් කළ යෝජනාව අමාත්‍ය මණ්ඩලය විසින් අනුමත කරන ලදී.

    අඩු සහ මධ්‍යම ආදායම්ලාභී පවුල් සඳහා නිවාස ලබා දීමේ වැඩසටහන කඩිනම් කිරීම

    - අඩු ආදායම්ලාභී පවුල් සහ මධ්‍යම ආදායම්ලාභී පවුල් සඳහා නිවාස හිමිකාරිත්වය ලබා දීමේ රජයේ වැඩසටහන යටතේ නිවාස 620,000ක් 2019 වසර වන විට ඉදි කිරීමට අපේක්ෂිතය. මෙම වැඩසටහන නියමිත කාල රාමු තුළ ඉටු වන බව සහතික කරගනිමින්, මෙම ව්‍යාපෘතිය වෙත ජාතික ප්‍රමුඛතාවක් ලබා දෙමින් කඩිනමින් ක්‍රියාත්මක කිරීම සඳහා අවශ්‍ය පහසුකම් සැලසීමේ අරමුණින්, මහා භාණ්ඩාගාරය යටතේ විශේෂ කාර්ය ඒකකයක් (සීමාසහිත පොදු සමාගමක්) පිහිටුවීමටත්, එම කාර්ය ඒකකය වෙත වෙන් කර දෙනු ලබන සියලුම් ඉඩම් සඳහා 'ඉඩම් බැංකුවක්' ස්ථාපිත කිරීමටත් ගරු අග්‍රාමාත්‍ය රනිල් වික්‍රමසිංහ මැතිතුමා ඉදිරිපත් කළ යෝජනාව අමාත්‍ය මණ්ඩලය විසින් අනුමත කරන ලදී.

    ලංකා රාජ්‍ය ජාලය ව්‍යාපෘතියේ දෙවන අදියරෙහි සේවා සැපයීමේ කොන්ත්‍රාත්තුව ප්‍රදානය කිරීම

    - අධිවේගී හා සුරක්ෂිත අන්තර්ජාල සම්බන්ධතා රාජ්‍ය ආයතන වෙත ලබා දීම මඟින් පුරවැසියන් සහ ව්‍යාපාරික ප්‍රජාව වෙත රාජ්‍ය සේවාවන් බාධාවකින් තොරව කඩිනමින් ලබා දීමේ අරමුණ පෙරදැරිව තොරතුරු හා සන්නිවේදන තාක්ෂණික නියෝජිතායතනය (ICTA) විසින් ක්‍රියාත්මක කරනු ලබන 'ලංකා රාජ්‍ය ජාලය' (Lanka Government Network - LGN) ව්‍යාපෘතියේ දෙවන අදියරෙහි සේවා සැපයීමට අදාළ කොන්ත්‍රාත්තුව, අමාත්‍ය මණ්ඩලය විසින් පත් කරන ලද සාකච්ඡා සම්මුති කමිටුවේ නිර්දේශ පරිදි ශ්‍රී ලංකා ටෙලිකොම් සමාගම වෙත ප්‍රදානය කිරීම පිණිස විදුලි සංදේශ හා ඩිජිටල් යටිතල පහසුකම් අමාත්‍ය හරීන් ප්‍රනාන්දු මැතිතුමා ඉදිරිපත් කළ යෝජනාව අමාත්‍ය මණ්ඩලය විසින් අනුමත කරන ලදී.


    Cabinet decisions 2017-01-31

    - http://www.cabinetoffice.gov.lk/cab...icle&id=15&Itemid=49&lang=si&dDate=2017-01-31
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    තිස්සමහාරාම - කවන්තිස්සපුර “සත්සුහදගම” 'සැමට සෙවණ' උදාගම්මානය ඉදිකිරීම සඳහා මුල් ගල තැබිම පසුගියදා සජිත් ප්‍රේමදාස මහතා විසින් සිදු කෙරිණි.

    Laying of the foundation stone for the 'Sathsuhadagama' model village under 'Samata Sevana' concept in Kawanthissapura, Tissamaharama in Hambantota District.


    16195766_10154484254505186_8981449307665693616_n.jpg


    - https://www.facebook.com/media/set/?set=a.10154484254345186.1073742555.194713160185&type=3
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    රුපියල් ලක්ෂ 392 වියදමකින් ඉදිවූ වගේගොඩ - කිරම ගම්මාන යා කෙරෙන පාලම ජනතා අයිතියට පත් කෙරිණි.

    16406669_10154490860055186_5080535163472156981_n.jpg
     

    Smartm

    Well-known member
  • Jul 19, 2008
    20,081
    20,657
    113
    හස්තිශෛලපුර
    Finishing touches to Lotus Tower by 2018: TRCSL

    Published : 10:05 am January 31, 2017

    By Darshana Sanjeewa

    With construction work of the Lotus Tower drawing to an end, the finishing touches on the interior of the structure would be completed by 2018, the Telecommunications Regulatory Commission of Sri Lanka (TRCSL) said yesterday.

    DM_20170131_A004-8.jpg


    Speaking to the Daily Mirror, Project Director W.D. de Alwis said the construction of the main structure was completed and that work on the petals of the lotus flower would commence in a fortnight.


    He said the petals which were assembled in another location had been transported to Colombo, and that they would be attached to the tower in two weeks time.


    ‘‘We have finished a major part of the construction and hope to stick to our schedule of completing everything by October this year. However, we have to complete the interiors of the building for businesses and hotels that would be housed, and it will take at least two to three months more than what was initially anticipated,” he said.


    The tower, originally scheduled to be completed by October 2017, is expected to house telecommunication antennas, offices and other recreation providers. Once completed, it will stand tall as the tallest building in Sri Lanka and South Asia with a height of 350 metres.

    The construction of the tower cost a staggering USD 104 million, with eighty per cent of the cost borne by the EXIM Bank of China.
    Further, the tower is said to have a telecommunication museum, restaurants, supermarkets, food courts, conference halls with seating for 400 people, a 1,000-seat auditorium, luxury hotel rooms, ballrooms and an observation gallery.


    However, the construction work of the tower came to a standstill in 2015 when Ports and Shipping Minister Arjuna Ranatunga claimed that the land on which the building was put up belonged to the Sri Lanka Ports Authority and that it had not been acquired through proper legal means.


    Constructed on a 10-acre land, the tower is to be a hot spot for communication, office spaces, malls and parks. Vehicle parking facilities are to be provided in the first few floors, while the upper floors are exclusively for telecommunication purposes.


    However, under phase two of the project, plans are underway to construct a theme park, shopping mall and vehicle park.

    - http://mirrorcitizen.dailymirror.lk/2017/01/31/finishing-touches-to-lotus-tower-by-2018-trcsl/

    :yes:
     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    Micro Cars partners China’s BAIC to make electric vehicles here

    z_pi-Micro-Cars-02-600x306.jpg

    z_pi-Micro-Cars-01.jpg


    Micro Cars Ltd will be venturing into assembling Electric Vehicles (EV) in Sri Lanka by the end of the year. This is in association with Beijing Automobile International Corporation (BAIC) who have now tied up with Micro Cars.

    Launched in December 2016 the EC 180 EV will be on the streets of China from January 2017. With the rapid growth in demand for with BAIC’s latest Electric Vehicle (EC180 EV) in line with BAICs plan in becoming a key player in the global automobile market it has selected Sri Lanka’s first Home-grown automobile manufacturer, Micro Cars as their partner for the Sri Lankan market.

    Chairman Micro Holdings Chairman Dr. Lawrence Perera aims to embrace the Sri Lankan industry with a unique and a personalized experience with innovative products with an attractive price tag. “We are now hoping to assemble this car in Sri Lanka as we see a demand for this segment,” Dr. Perera said.

    EC 180 EV will be equipped with a “Ternary Lithium Battery” that has a capacity of 20.3 kWh and the ability to go on slow charge and also comes with a charging kit and charger unit.

    “On a full charge the car could run up to 156 kilometers, which is in par with the latest EVs available in the island. Micro Cars plans to revolutionise the Sri Lankan EV market with the EC 180 EV in the future.”

    “With BAIC, Micro cars enables new opportunities to potential consumer and to further enhance the Sri Lankan automobile industry and to play a leading role targeting the regional markets in the near future.”

    He said that Micro cars are also being exported for the past few years and they also hope to re export the Electric Vehicle (EC180 EV) from 2018.”

    - http://www.dailynews.lk/2017/02/02/...ners-china’s-baic-make-electric-vehicles-here
     
    • Like
    Reactions: akilar25

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    J.J. Construction to build solar panels with US$ 60 mn investment

    To partner with Electricity Board for forward agreement

    z_pi-J.J.-Construction.jpg


    China’s J. J. Construction is planning to manufacture solar panels in Sri Lanka from mid 2017.

    J. J. Construction Chairman, J. J. Lee told Daily News Business that they see a great demand for solar panels and they see this as a viable investment.

    The company has already invested US$ 30 million for the first purpose built Chinese five star hotel, Jie Jie Beach opened in early January in Panadura. This is also Sri Lanka’s first solar powered hotel and also constructed by Chinese engineers.

    This is a joint venture with White Heaven Hotels, Panadura.He said that their parent company set up early in 1980’s in now an international construction company and have built many skyscrapers. “We were also involved in the building of the Beijing Olympics Stadium.”

    He said that Jie Jie Beach was their first overseas as well as leisure sector investment. “The experience in getting into Sri Lanka was very pleasing and this was one of the main reasons for us to look at reinvesting in Sri Lanka.”

    He said that they are keen to import all the raw material and manufacture solar panels in Sri Lanka. “We will also look at re exports to neighbouring countries from Sri Lanka.”

    He said Sri Lankan authorities have now realised the importance of solar and they hope to come to a forward agreement with the Sri Lanka Electricity Board. “We hope to invest around US$ 60 million for the factory and will employ over 100 Sri Lankans supervised by Chinese engineers.”

    He said that his JV partner White Heaven Hotel Panadura Chairman Sunil Silva has already identified a 25 acre land to put up a factory. “We hope to get the approvals from BOI soon.”



    He said that they are upbeat of the Sri Lankan tourism sector and is planning to build three more hotels. Lee said that the Jie Jie hotel is a success story of the implementation of solar energy and will use solar for all their future endeavours.”

    - http://www.dailynews.lk/2017/02/02/...uction-build-solar-panels-us-60-mn-investment
     

    KDH

    Well-known member
  • Jul 4, 2014
    18,309
    8,415
    113
    රූකඩ රාජ්ජේ



    රටම අන්දයි.. මාස හතරකට කලින් මධ්‍යම අධිවේගය දෙවන අදියරට එකම තැන දෙවරක් වැඩ අරඹලා..

    ඊයේ දිනයේදී අගමැති රනිල් වික‍්‍රමසිංහ මහතා ඇතින් මධ්‍යම අධිවේගී මාර්ගයේ දෙවන අදියරේ ඉදිකිරීම් ආරම්භ කර ඇත්තේ දෙවන වතාවට බව සිරස රූපවාහිනිය සිය ප‍්‍රවෘත්ති විකශයේදී පෙන්වා දුන්නේය.

    2016 ඔක්තෝබර් 6 වනදා ඇමති ලක්ෂ්මන් කිරිඇල්ල මහතා එම ස්ථානයේදීම සමරු ඵලකයක් විවෘත කර මධ්‍ය අධිවේගයේ දෙවන අදියර වැඩ ආරම්භ කල බව එම වාර්තාවේ සදහන් විය.



     

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    New construction of a mixed-used mall with apartments, multiplex cinema and restaurants Alexandra Place, Colombo, Sri Lanka 60,000 m² 2019 Odel PLC, Sri Lanka.

    1371_odel_aussen_web__01-1600x960.jpg


    In terms of Odel, we have planned on a 100 million US dollar investment, which will be the 670,000 sqft ultra chic and modern Mall. We hope to commence construction within the next one month. This would also have 40 high-end apartments and a fully-fledged cinema complex, which will operate seven screens. We have partnered with India's largest cinema operator in this regard. I feel this would be a great addition to the country and for our growth.

    - http://businesstoday.lk/cover_page.php?article=11259
     
    Last edited:

    monson

    Well-known member
  • May 7, 2007
    25,464
    28,235
    113
    Sukithapura programme receives green light from Cabinet for 64 projects

    The cabinet has approved the implementation of 64 construction projects under the Sukithapura programme.


    The proposal made by the Megapolis and Western Development Minister Champika Ranawaka to complete contracts that were awarded last year, which could not be completed due to various factors, and implement programmes for the 2017 financial year, was approved by the cabinet.


    Last month the reported that the funds allocated for infrastructure projects in the Western Region was insufficient to begin new proposed projects.


    Sukithapura or Sukithapurawara, the major infrastructure development plan for the Western Province was allocated Rs. 10 billion last year. The project is set-up to upgrade infrastructure facilities, develop and beautify 23 townships in the Western Province, paving the way for mega development projects such as the financial city in the region.


    The mega project began 70 other development projects last year, twenty percent of which are scheduled to be completed in the next two months. The large spectrum of Sukithapura envisions the initiation of more projects, but sources say the Rs. 4.8 billion allocated by the state for 2017 will only be sufficient to complete existing projects but not to commence new ones.


    Towns such as Borella, Kesbewa, Kottawa, Kaduwela, Piliyandala, Battaramulla, Kadawatha, Mahara, Meerigama, Kalutara, Homagama, Maharagama, Kottawa, Horana, Panadura and Bulathsinhala are some areas that will be developed under the project.
    Colombo is to be made into a commercial city and all administrative facilities are to be shifted outside the city. The project will also make the necessary infrastructure facilities for this change, officials said.


    Projects on a smaller scale such as the relocation of Manning Market in Pettah to Peliyagoda will also come under the Sukithapura project.


    Long term goals of the project would be to acquire land for large scale development projects, for specific development projects such as the establishment of a tech city, and transportation hubs.

    - http://mirrorcitizen.dailymirror.lk...ves-green-light-from-cabinet-for-64-projects/
     

    KDH

    Well-known member
  • Jul 4, 2014
    18,309
    8,415
    113
    රූකඩ රාජ්ජේ

    නිදහස් උලෙලේ පෙර පුහණුවේදී පැරිෂුට් භටයෝ පහක් ඇද වැටෙති.. අයෙක් රෝහලේ..

    හෙට දිනයේ පැවැත්වීමට නියමිත 69 වන නිදහස් දින පෙරහුරුව අද ගාළු මුවදොර පැවතෙද්දී පැරිෂුට් භටයින් පස් දෙනෙකු මුහුදට ඇද වැටී තිබේ.

    මෙම සියළු දෙනා නාවුක හමුදාව විසින් බේරාගෙන ඇත.

    හෙලිකොප්ටරයෙන් බිමට වැටුනු එක් පැරිෂුට් භටයෙක් රෝහල්ගත කර ඇත.
     

    KDH

    Well-known member
  • Jul 4, 2014
    18,309
    8,415
    113
    රූකඩ රාජ්ජේ

    මහින්ද කෝටි ගනන් ණය වී ගත් යුද යානාවලින් අද අභිමානවත් ලෙස 69 වෙනි නිදහස් දින සමරයි..

    වසර 30 ක් පැවති ලෝකයේ දරුණුතම කොටි ත්‍රස්තවාදී යුද්ධය නිමකිරීමට මහින්ද රාජපක්ෂ ප්‍රමුඛ රජයට 2009 වසරේ දි හැකි විය.

    එදා දෙමළ කොටි ඩයස්පෝරාව යුරෝපයේ ඇමරිකාවේ මෙන්ම කැනඩාවේ සිට තම ජාත්‍යන්තර සම්බන්ධතා උපයෝගී කොට ගෙන ශ්‍රීලංකාව යුද්ධයට අවශ්‍ය අවි ආයුධ ලබාගැනීමට ඇති අවස්ථාවන් සියල්ලම අවහිර කලේය.

    එහෙත් ඒ සියලු බාධක මැඩලමින් දෙමළ ත්‍රස්තවාදීන්ගේ ඒ සියලු උපක්‍රම අභිබවා යමින් එම කුරිරු යුද්ධය අවසන් කිරීමට ත්‍රිවිධ හමුදාව මෙන්ම ඔහුනට අවශ්‍ය යුද ටැංකි ඇතුළු සියලුම නවීන අවි ආයුධ අවශ්‍ය තරම් ලබාදීමට එකල රයට හැකිවිය.

    අදටත් ඒ වෙනුවෙන් ත්‍රිවිධ හමුදාවේ මෙන්ම හිටපු නායකයින් මෙම මිලදිම් ගැනිම් සම්බන්ධව ප්‍රශ්න කරන අතර එසේ ගෙන්වන ලද යුද උපකරණ සඳහා මහින්ද රාජපක්ෂ කෝටි ගනන් ණය වී ඇති බව ඒ දිනවල ප්‍රවෘත්ති මගින් නිතරම ප්‍රචාරය විය.

    අද 69 වෙනි නිදහස් දිනය ගාලු මුවදොර සිට ඉතා අභිමානව සමරන්නේ එදා මහින්ද රාජපක්ෂ යුද්ධය අවසන් කිරීමට නොයෙකුත් බාධා මැද ණයවී ගත් ත්‍රිවිධ හමුදාව සතු විශාල ප්‍රමාණ්යේ යුද හමුදා ට්‍රක් රථ කාලතුවක්කු ඩෝරා යාත්‍රා සහ ප්‍රහරක ගුවන් යානා උපයෝගී කර ගනිමිනි.