slab thick assume as 200mm
total cube = 7.44
assume as concrete grade = 20
Cement - 135 (50kg bags)
Sand - 3.12 cube
Metal 3/4 - 6.19 cube

harida
slab eke thick eka mn hitala dapu ekak, plan eke kiyada thick eka??
kambi hadanna mokak hari drawing ekak tiyeda??
Y10 kambi 700kg wage yawi
( meka nm hitala kiwwe 150mm space tiyala 10*100 area ekata wage)