Offgrid Solar System තියෙන අය කො

netnet

Well-known member
  • Oct 6, 2016
    9,569
    8,310
    113
    mama thama batteries tika test karanawa :lol: eka module ekak 27Ah wage thama enne. JK 200A BMS ekak thama danne. Anik badu okkoma aran inne

    inverter eke AC in ekata kalin over/under protecttor ekai inverter out eke protector ekai grid energy monitor ekai offgrid monitor ekai hera anik badu okkoma hari
    cell vala voltage keeyada ? 27Ah kohomda calculate karala tiyenne? 7Kw nam

    inverter capacity eken 75-80% wada use karanna bari wenna voltage control danna. inverter AC in out dekatama SPD danna
     

    Lakshan-Seram

    Well-known member
  • May 31, 2011
    24,731
    12,645
    113
    127.0.0.1:8080/Kandy
    cell vala voltage keeyada ? 27Ah kohomda calculate karala tiyenne? 7Kw nam

    inverter capacity eken 75-80% wada use karanna bari wenna voltage control danna. inverter AC in out dekatama SPD danna
    Mage laga tester ekak na me wage loku ewa test karanna 3.7 Lithium iron tester ekakin thama module eke center tap eka use karala test kare.
    randomly thaam test karanne denata ekai test karte eka thama wedima internal resistance ekak pennapu eka. 13mr pennuwa 27ah total capacity eka cell group ekakaka.
    den module ekak test wenna dala tiyenne IR eka 6mr, 4.2v charge ekarala den discharge wenawa voltage eka 3.95v tiyenne capacity eka denata 8.5ah wage pennanawa 2014 Leaf set ekak
    mama CEB grid eka issarawelama indicator ekakata aran ethanin breaker ekakata aran itapasse SPD ekakata aran -> over under protector eka haraha, energy meter ekata -> inverter ekata and changeover .
    inverter out eka ayeth indicator ekakata dala -> breaker -> over under protector ekak -> energy meter -> manual change over -> House
    inverter out ekata SPD ekak hithuwe na. SPD ekak denma PV ekata. Thawa mona hari danna oneda?
     
    Last edited: