කාන්තාවන්ට තහනම් ලංකාවේ බිංගේ..

hakalanmulla

Active member
  • May 3, 2011
    155
    24
    28
    dikwella
    bump
    ඕක තියෙන්නේ අපේ ගෙවල් පැත්තේ. කොච්චි පාරේ වැඩ නවත්තලානම් නැ
     

    Matara_C

    Well-known member
  • Oct 30, 2015
    1,135
    811
    113
    රාහුල පාර,මාතර.
    හේතුව?


    අහ්..අපේ කෝච්චි අයියා..

    ඒක ඇවිල්ලා අයියේ චීන මිනිස්සුන්ගේ විශ්වාසයක්ලු.
    ඒක කොච්චර දරුණුද කිව්වොත් උන් ඒක උන්ගේ කොන්ත්‍රාත් ගිවිසුමටත් දාලාලු..
     

    monson

    Well-known member
  • May 7, 2007
    25,612
    28,586
    113
    ඔය පාරෙ වැඩ නතර කරලෙ නේද මදැයි අපමන අගේ,

    Boru hila. Menna ada paththaren :P

    Over 8o percent of work is over : May 12 2016


    May 12 2016
    Raja Waidyasekera

    Work on the Matara-Beliatta railway line will come to an end by 2017. Over 8o percent of work is over, Project Director V. Amaratunga said. He said the biggest railway station in the south will be set up in Beliatta. The project is funded by China. About 229 acres belonging to 1,225 families were acquired. The railway line will run across the Matara-Hambantota main road at Beliatta and Dikwella.

    Railway stations will be set up at Kekanadura, Babarenda and Wewrukannala. The railway line will run through two tunnels. The tunnel at Nakuttiya will be the largest railway tunnel in the country, Amaratunga said.


    - http://www.dailynews.lk/?q=2016/05/12/local/81440

    Over 40 pc of Matara - Beliatta railway line complete - Nov 06 2015

    The construction work on the Matara - Beliatta railway line is in progress. Over 40 percent of the construction work is complete, according to project director V. Amaratunga.

    The construction work will come to a climax in 2016. Amaratunga added that under the project, the southern region's largest railway station will be built at Beliatta.

    He said the tunnel at Nakuttiya will be the longest tunnel in the country which has an extent of 606 metres.

    A total of 229 acres belonging to 1,225 families were acquired for the project. Compensation up to Rs. 978 million was paid to them to launch the construction work, the project director said.

    Amaratunga said another tunnel will be set up at Babatenda which would be 238 metres long. He added that railway stations will be set up at Kekanadura, Babarenda and Wewrukannala while sub-stations will be set up at Piladuwa and Weherahena.

    - http://www.dailynews.lk/?q=2015/10/22/local/over-40-pc-matara-beliatta-railway-line-complete
     

    ryandok

    Well-known member
  • Oct 11, 2011
    13,684
    1
    3,804
    113
    වලපල්ලේ
    ගෑනු ගෑවුන තැන විනාසයි කියලා චීනාත් විස්වාස කල හින්දා උමග බේරුනා :lol::lol::lol:
     

    sandunrulz.s

    Well-known member
  • Dec 2, 2011
    1,533
    508
    113
    34
    Haven
    යකෝ චීන්නුත් ගෑනුන්ට බයයි කියල අදනේ දන්නෙ
    ලැජ්ජයි චිනෝ
     

    Similar threads