Bid to cut solar power production during low demand; committee studies curtailment mechanism වැඩේ දෙනවා Solar වලට confirmed !

monson

Well-known member
  • May 7, 2007
    24,895
    26,940
    113

    Naphtha-fired power generation to be expanded :lol:


    The Ceylon Electricity Board (CEB) has appointed a committee to introduce a “curtailment mechanism” for solar power systems to cut production when electricity demand is low.

    If implemented, the move will be a blow to small-scale power producers who have invested in the hope of both returns and cheaper electricity bills.


    The eight-member committee is headed by National System Control Centre (NSCC) Chief Engineer W.A.R.S. Weeratunga. Its appointment took place just two days before last Sunday’s countrywide blackout.

    “As the integration of Non-Conventional Renewable Energy (NCRE), particularly Solar Photovoltaic (PV) systems, continues to expand within the national grid, it has become imperative to introduce a curtailment mechanism for maintaining grid stability, particularly during periods of low electricity demand, such as on mercantile holidays and Sundays, when commercial and industrial activities are minimal,” states a letter to Mr. Weeratunga from the CEB’s Additional General Manager (Transmission-Non-Wired Operations).

    “Until a permanent and sustainable NCRE curtailment solution is established, this interim measure will help manage the imbalance between energy supply and demand, ensuring the grid remains stable and reliable during these critical times,” it says.

    It is not clear how this will be implemented. “Almost all of the NCRE feed-in tariff-based renewable projects are contractually designed as must-run plants,” said Vidhura Ralapanawe, energy sector analyst and a strong proponent of renewable energy. “There are no curtailment provisions in the power purchase agreement. There are no curtailment provisions in rooftop solar agreements, either.”

    “The tariffs for these systems are calculated without taking curtailment into consideration, and if the CEB tries to do that (outside of legal provisions), the investors and homeowners will run into financial challenges,” he warned.

    The proposed curtailment mechanism will be implemented with the CEBAssist Solutions (the CEB’s digital platform that allows customers to pay their bills online, among other things) “by integrating the relevant OT [operational technology] systems to regulate NCRE plant generation while maintaining cybersecurity standards, the CEB AGM’s letter says.

    The committee is tasked with identifying the power plants that could be “monitored and controlled” by the relevant distribution coordination committees (DCC); designing and implementing a curtailment mechanism that should be adopted by the DCC on the request of the NSCC as part of CEBAssist Solutions; and integrating with the relevant OT systems to enable real-time curtailment of ground-mounted solar plant generation.

    It is also instructed to determine and incorporate a suitable algorithm for solar PV generation curtailment within CEBAssist Solutions and to create a process to implement a “transparent curtailment mechanism in order to avoid the curtailment of the same power plants in subsequent periods unless it is really necessary.”

    Meanwhile, another committee—also headed by Engineer Weeratunga—has been appointed to develop an integrated rooftop solar monitoring system for real-time data collection. At present, this segment of electricity production cannot be seen by the CEB System Control.

    The appointment letter says that rooftop solar PV generation contributes a significant portion of daytime energy generation at present, with total installed capacity exceeding 1,400 MW and continuing to grow.

    “Therefore, it is essential to monitor this generation in real-time,” it states. “Having access to accurate and real-time rooftop solar generation data at the NSCC will enable more informed decision-making in planning the generation and system frequency balancing.”

    This committee was set up on January 28, 2025, and is instructed to integrate rooftop solar inverter manufacturers’ monitoring platforms with CEBAssist Solutions; poll real-time generation data from smart meters installed at rooftop solar customer locations; develop a mechanism to present the collected data via the CEBAssist NCRE Desk Module at the NSCC; and establish “a methodology to systematically include new rooftop solar connections into this monitoring platform, ensuring scalability and efficiency.”

    - https://www.sundaytimes.lk/250216/n...tee-studies-curtailment-mechanism-588057.html


    සෝලා විදුලිය අඩු කරන්න කමිටුවක්..ගල් අඟුරු සහ තෙල් බලාගාර මාෆියාකරුවන් වත්මන් ආණ්ඩුව යටතේ යළිත් හිස ඔසවමින් සිටි! - චම්පික රණවක​

    https://elakiri.com/threads/සෝලා-විදුලිය-අඩු-කරන්න-කමිටුවක්-ගල්-අඟුරු-සහ-තෙල්-බලාගාර-මාෆියාකරුවන්-වත්මන්-ආණ්ඩුව-යටතේ-යළිත්-හිස-ඔසවමින්-සිටි-චම්පික-රණවක.2199096/
     
    Last edited:

    banda065

    Well-known member
  • Apr 20, 2007
    4,467
    6,124
    113
    අර ලගදි ගියා කියපු
    අල්ලපු රටෙ විදුලි කලු කඩ කාරයා තාමත් ඇහැ දාගෙන ඇත්තෙ
     

    Bitter Truth

    Well-known member
  • Dec 19, 2015
    23,240
    45,123
    113
    රටටම ඕකෙන් ප්‍රශ්ණයක් වෙනවනම් ඵහෙම වෙන ඵක හොඳයි.🙏.ඵකෙක් දෙන්නෙක්ගේ වාසියට කෝටි 2ක්ම වන්දි ගෙවන්න ඕන නෑනේ..🤔
     
    • Angry
    Reactions: monson

    monson

    Well-known member
  • May 7, 2007
    24,895
    26,940
    113
    Sri Lanka on reverse gear again.. Maalimawata jaya wewa..
    කොහොමද @Tricle_Buwa ලා උස්සන් ආපු JVP හිඟන්නන්ගේ වැඩ ? මුලින්ම වැඩේ දුන්නේ මේවට.

    NPP Mr. Coal පු*රුදය උදාකරයි: හම්බන්තොට සූර්ය බලශක්ති ව්‍යාපෘති 30ක් වහාම අත්හිටුවයි !​

    https://elakiri.com/threads/npp-mr-coal-පු-රුදය-උදාකරයි-හම්බන්තොට-සූර්ය-බලශක්ති-ව්‍යාපෘති-30ක්-වහාම-අත්හිටුවයි.2196994/#post-30516213

    1. හම්බන්තොට solar projects 30ක් නවත්තනවා
    2. Roof top solar වලට ගෙවන ගාන 16ට අඩු කරනවා
    3. Roof top solar වලටත් tenders දාන්න ඕනේ කියනවා
    4. sub station එකක earth fault / CEB system control උන්ගේ වැරද්දක් නිසා වෙච්ච black out එකක් solar power පිටින් යවනවා
    5. Solar generation curtail කරන්න යනවා
    6. 484MW wind power project (including transmission line construction) කරන්න ගිය investor ව එලවනවා.
    7. EV වලට tax දෙගුණයක් කරනවා


    කොහොමද CEB Engineers Union Mafia + JVP හිඟන්නන්ගේ වැඩ


    ------ Post added on Feb 16, 2025 at 10:16 AM
     
    Last edited:

    Hapuwa

    Well-known member
  • Jan 24, 2009
    5,095
    3,081
    113
    කොහොමද @Tricle_Buwa ලා උස්සන් ආපු JVP හිඟන්නන්ගේ වැඩ ? මුලින්ම වැඩේ දුන්නේ මේවට.

    NPP Mr. Coal පු*රුදය උදාකරයි: හම්බන්තොට සූර්ය බලශක්ති ව්‍යාපෘති 30ක් වහාම අත්හිටුවයි !​

    https://elakiri.com/threads/npp-mr-coal-පු-රුදය-උදාකරයි-හම්බන්තොට-සූර්ය-බලශක්ති-ව්‍යාපෘති-30ක්-වහාම-අත්හිටුවයි.2196994/#post-30516213

    1. හම්බන්තොට solar projects 30ක් නවත්තනවා
    2. Roof top solar වලට ගෙවන ගාන 16ට අඩු කරනවා
    3. Roof top solar වලටත් tenders දාන්න ඕනේ කියනවා
    4. sub station එකක earth fault / CEB system control උන්ගේ වැරද්දක් නිසා වෙච්ච black out එකක් solar power පිටින් යවනවා
    5. Solar generation curtail කරන්න යනවා
    6. 484MW wind power project (including transmission line construction) කරන්න ගිය investor ව එලවනවා.
    7. EV වලට tax දෙගුණයක් කරනවා
    කියල වැඩක් නෑ මචන්, රට ඔලුව උස්සලා ගොඩ එන්න හදන හැම පාරම අපේ එවුන්ට අමුතු පුක රුදාවක් ඇවිල්ලා ඇර ගන්නවා ලොවෙත් නැතිවෙන්න.

    @Tricle_Buwa සෝලා වලට මේ වෙන්න යන දේ ගැන ඔබේ අදහස් ඉදිරිපත් කරන්න. ස්තුතියි. 🙂
     

    dinuksha_asela

    Well-known member
  • Feb 7, 2007
    6,510
    10,616
    113
    Nugegoda, Sri Lanka
    Solar gahPu ewun ayyo mage salii
    Mama danna owa gahapu keepa denek maaliwata kade gihin chandeth dunna.. dan innawa ati kehel gilala wage lol.. paw wade :lol:

    කියල වැඩක් නෑ මචන්, රට ඔලුව උස්සලා ගොඩ එන්න හදන හැම පාරම අපේ එවුන්ට අමුතු පුක රුදාවක් ඇවිල්ලා ඇර ගන්නවා ලොවෙත් නැතිවෙන්න.

    @Tricle_Buwa සෝලා වලට මේ වෙන්න යන දේ ගැන ඔබේ අදහස් ඉදිරිපත් කරන්න. ස්තුතියි. 🙂
    Ow Democracy genna, Good governance wage amaru mun nittawata saneepa kara.. :lol:
    ------ Post added on Feb 16, 2025 at 10:28 AM

    CEB engineers private power plant mafia managed to fool previous govts

    Looks like they are attempting it again.

    Let's hope this Govt is not fooled too
    No need to fool.. these guys are part of it.. not sure why you couldnt figure that out… :lol:
    ------ Post added on Feb 16, 2025 at 10:30 AM
     
    • Like
    Reactions: EVC

    mayadmax

    Well-known member
  • Apr 24, 2007
    6,201
    4,559
    113
    meka hari. ape un ivak bawak natuwa solar gahanne salli salli kiala. kela wenne apitamai. grid eka hadenakan, energy storage options enakan, limit ekak enna oni.
     
    • Haha
    Reactions: EVC

    Hapuwa

    Well-known member
  • Jan 24, 2009
    5,095
    3,081
    113
    meka hari. ape un ivak bawak natuwa solar gahanne salli salli kiala. kela wenne apitamai. grid eka hadenakan, energy storage options enakan, limit ekak enna oni.
    එහෙම සිල්කලර කඩ දානවා වගේ සෝලා ගහන්න බැහැ. CEB / LECO clearance අරන් ඉන්න ඕනේ. Clearance එක දෙද්දි බලන්නෙ අවුරුදු විස්සක් යනකම් (forecasted demand) grid එක අන්ස්ටේබල් නොවී ඒ ලොකේෂන් එකේ solar plant එකක් continuesly run කරන්න පුළුවන්ද කියන එක.

    ඊට පස්සේ plant owner agreement එකක් ගහනවා CEB/LECO එක්ක අවුරුදු විස්සක් යනකම් සෝල එනජි continuously සප්ලයි කරනවා කියලා සහ ඒකට CEB එකෙන් සල්ලි ගෙවනවා කියලා

    CEB වැඩ කරන උන්, උගේ යාලුවෝ, එහෙමත් නැත්නම් සල්ලි වලට, එහෙමත් නැත්තං නොදැනුවත්කම අදක්ෂකම නිසා අවශ්‍ය ප්‍රමාණයට වඩා සමහර තැන්වල ින් සෝලා plant install කරලා තියෙනවා නම්, ඒක හින්දා grid එක අන් බැලන්ස් වෙනවා නම්, ඒකට පිළියමක් විදිහට සාධාරණ විදිහට සල්ලි යොදවලා plant setup කරපු අය ට නීති විරෝධී විදිහට කෙළවනවා නම් ඒක හරි කියලද කියන්නේ?

    මතක තියාගන්න මේක සොලවලින් විතරක් නවතින එකක් නෙමෙයි. එනජි වගේම අනිත් හැම ඉන්ඩස්ට් එකේම mafia එකක් තියෙනවා රජයෙන් කරන්න ඕනේ ඒක පාලනය කරන එක හරි නවත්තන එක හරි නැතුව උන්ට සපෝට් කරලා හම්බ කරගන්න එක නෙමෙයි. කවදාහරි ආයි කන්න බොන්නෙ තුව බෙහෙත් නැතුව, තෙල් නැතුව පාරේ පෝලිං වල ඉන්නකොට solar වලට වෙන දේට හිනා වෙන ගොබ්බ කුහක හැත්තට හොඳට තේරුම් යයි.
     
    Last edited:

    dinuksha_asela

    Well-known member
  • Feb 7, 2007
    6,510
    10,616
    113
    Nugegoda, Sri Lanka
    එහෙම සිල්කලර කඩ දානවා වගේ සෝලා ගහන්න බැහැ. CEB / LECO clearance අරන් ඉන්න ඕනේ. Clearance එක දෙද්දි බලන්නෙ අවුරුදු විස්සක් යනකම් (forecasted demand) grid එක අන්ස්ටේබල් නොවී ඒ ලොකේෂන් එකේ solar plant එකක් continuesly run කරන්න පුළුවන්ද කියන එක.

    ඊට පස්සේ plant owner agreement එකක් ගහනවා CEB/LECO එක්ක අවුරුදු විස්සක් යනකම් සෝල එනජි continuously සප්ලයි කරනවා කියලා සහ ඒකට CEB එකෙන් සල්ලි ගෙවනවා කියලා
    Yes they should encourage Storage solution.. end user and Strategic (hydro, battery)
     
    Last edited:

    Tricle_Buwa

    Well-known member
  • Sep 15, 2019
    12,222
    17,686
    113
    කොහොමද @Tricle_Buwa ලා උස්සන් ආපු JVP හිඟන්නන්ගේ වැඩ ? මුලින්ම වැඩේ දුන්නේ මේවට.

    NPP Mr. Coal පු*රුදය උදාකරයි: හම්බන්තොට සූර්ය බලශක්ති ව්‍යාපෘති 30ක් වහාම අත්හිටුවයි !​

    https://elakiri.com/threads/npp-mr-coal-පු-රුදය-උදාකරයි-හම්බන්තොට-සූර්ය-බලශක්ති-ව්‍යාපෘති-30ක්-වහාම-අත්හිටුවයි.2196994/#post-30516213

    1. හම්බන්තොට solar projects 30ක් නවත්තනවා
    Approval තියන ඒව නවත්තල තියෙන්නෙ කොහෙද?
    2. Roof top solar වලට ගෙවන ගාන 16ට අඩු කරනවා
    misleading. ඔය ගානට අඩු උනත් අඩු වෙන්නෙ industrial system.
    3. Roof top solar වලටත් tenders දාන්න ඕනේ කියනවා
    Roof top වලටත් කියන්නෙ? ගෙවල් වල ගහන ඒව විතරක් නෙමේ rooftop කියන්නෙ.
    4. sub station එකක earth fault / CEB system control උන්ගේ වැරද්දක් නිසා වෙච්ච black out එකක් solar power පිටින් යවනවා
    මේක officialy හරියටම තාම කොහෙවත් කිවේ නැනෙ. ඕක මතයක් විතරයි. ඕක පිටින් දාල මේව නවත්තන්න ත් බෑ කොහොමත්
    5. Solar generation curtail කරන්න යනවා
    තාම confirm නෑ. ඕවත් මත එක එකාගෙ
    6. 484MW wind power project (including transmission line construction) කරන්න ගිය investor ව එලවනවා.
    ඡන්දෙ කාලෙ කිව්වෙ පුලුවම් නම් අදානිව එලෝල පෙන්නපම් කියල. දැන් අඩනව ගියා කියල 🤣
    7. EV වලට tax දෙගුණයක් කරනවා
    ඒව නම් මං දන්නෑ. වාහන මට අදාල නෑCE



    කොහොමද CEB Engineers Union Mafia + JVP හිඟන්නන්ගේ වැඩ
    CEB engineer සෙට් එක අලුතෙන් පත් උනේ නෑ. හිටපු උන්ම තමා.

    කොහොමද @Tricle_Buwa ලා උස්සන් ආපු JVP හිඟන්නන්ගේ වැඩ ? මුලින්ම වැඩේ දුන්නේ මේවට.

    NPP Mr. Coal පු*රුදය උදාකරයි: හම්බන්තොට සූර්ය බලශක්ති ව්‍යාපෘති 30ක් වහාම අත්හිටුවයි !​

    https://elakiri.com/threads/npp-mr-coal-පු-රුදය-උදාකරයි-හම්බන්තොට-සූර්ය-බලශක්ති-ව්‍යාපෘති-30ක්-වහාම-අත්හිටුවයි.2196994/#post-30516213

    1. හම්බන්තොට solar projects 30ක් නවත්තනවා
    Approval තියන ඒව නවත්තල තියෙන්නෙ කොහෙද?
    2. Roof top solar වලට ගෙවන ගාන 16ට අඩු කරනවා
    misleading. ඔය ගානට අඩු උනත් අඩු වෙන්නෙ industrial system.
    3. Roof top solar වලටත් tenders දාන්න ඕනේ කියනවා
    Roof top වලටත් කියන්නෙ? ගෙවල් වල ගහන ඒව විතරක් නෙමේ rooftop කියන්නෙ.
    4. sub station එකක earth fault / CEB system control උන්ගේ වැරද්දක් නිසා වෙච්ච black out එකක් solar power පිටින් යවනවා
    මේක officialy හරියටම තාම කොහෙවත් කිවේ නැනෙ. ඕක මතයක් විතරයි. ඕක පිටින් දාල මේව නවත්තන්න ත් බෑ කොහොමත්
    5. Solar generation curtail කරන්න යනවා
    තාම confirm නෑ. ඕවත් මත එක එකාගෙ
    6. 484MW wind power project (including transmission line construction) කරන්න ගිය investor ව එලවනවා.
    ඡන්දෙ කාලෙ කිව්වෙ පුලුවම් නම් අදානිව එලෝල පෙන්නපම් කියල. දැන් අඩනව ගියා කියල 🤣
    7. EV වලට tax දෙගුණයක් කරනවා
    ඒව නම් මං දන්නෑ. වාහන මට අදාල නෑCE



    කොහොමද CEB Engineers Union Mafia + JVP හිඟන්නන්ගේ වැඩ
    CEB engineer සෙට් එක අලුතෙන් පත් උනේ නෑ. හිටපු උන්ම තමා.
    ------ Post added on Feb 16, 2025 at 11:00 AM
     

    Tricle_Buwa

    Well-known member
  • Sep 15, 2019
    12,222
    17,686
    113
    කියල වැඩක් නෑ මචන්, රට ඔලුව උස්සලා ගොඩ එන්න හදන හැම පාරම අපේ එවුන්ට අමුතු පුක රුදාවක් ඇවිල්ලා ඇර ගන්නවා ලොවෙත් නැතිවෙන්න.

    @Tricle_Buwa සෝලා වලට මේ වෙන්න යන දේ ගැන ඔබේ අදහස් ඉදිරිපත් කරන්න. ස්තුතියි. 🙂
    ඔය කියන තරම් එකක් වෙන්නෙ නෑ. බය නොවී ඉන්නකො ටිකක්.. එක එකා උන්ට හිතෙන හිතෙන ඒව කියෝ කියෝ යනව. ඒව නවත්තන්න බෑනෙ. වැඩේ එහෙම උනොත් බලමු.
     

    monson

    Well-known member
  • May 7, 2007
    24,895
    26,940
    113
    තාම confirm නෑ. ඕවත් මත එක එකාගෙ
    jT4WQAa.jpeg


    Naphtha-fired power generation to be expanded​


    The Ceylon Electricity Board (CEB) is looking to expand the use of naphtha-fired thermal power as a cost-saving measure, The Sunday Morning learns.

    - https://www.themorning.lk/articles/GVn0tBrwvjxjnMsd31M9
     

    nppcheguevara

    Well-known member
  • Feb 13, 2023
    8,476
    8,647
    113
    ulan bator
    CEB engineer සෙට් එක අලුතෙන් පත් උනේ නෑ. හිටපු උන්ම තමා.

    ------ Post added on Feb 16, 2025 at 11:00 AM
    CEB / PORT / Agri - most goverment sectors wala inne thadi jeppo. 1994 idan jeppo anduwe rassa walata damma
    ubamata mewa confim karannaona nam 2019 NPP prathipaththi prakase hadapu un ge thanatharu balapam.
    ahawal amathyansaya hitapu methuma.. arathuma bla bal bala...
     
    • Like
    Reactions: dinuksha_asela