ගෙදරකට Single Phase vs 3 Phase ගන්න එකේ වාසි අවාසි මොනාද?

tharakaf

Well-known member
  • Oct 19, 2020
    36,454
    75,177
    113
    ube purpose eka light bill eka gewal dekema wena wenama adu kara ganna nam gewal 2kema 5Kw 2k gahapan, CEB net accounting over 5KW+ gahanna be.
    investment plan ekak widihata yanne nam 20kw net plus ekak gahapan. 10kw 2k gahana eka terumak ne.


    Pacha daanna epa yako. Ranilge kaalema net accounting 5KW walata restrict kare. Mun kare net++ eka ain karapu eka.
    යට තට්ටුවෙ කාමර 2යි, උඩ එකේ කාමර 3යි. යට එකට single අරන් උඩ එකට 3phase ගත්තානම් හරි වගේ නේ. වහල 1500sqft තියෙනවා, මම බැලුවෙ ගෙවල් දෙකට 10kw ගානෙ බෙදලා දෙන්න
     
    • Like
    Reactions: Yin And Yang

    monson

    Well-known member
  • May 7, 2007
    25,625
    28,611
    113
    Pacha daanna epa yako. Ranilge kaalema net accounting 5KW walata restrict kare. Mun kare net++ eka ain karapu eka.
    ඉස්සර ඉඳන් 5KW - CEB, 6/7KW Leco limit එක තියෙන්නේ single phase 30A එකට දෙන්න පුළුවන් උපරිම ගාන නිසා .
    ගෙදරට three phase 30 A - 20KW, 60A - 42KW උපරිම ගහන්න පුළුවන් මෝඩ ජෙපි ආණ්ඩුව එන්න කලින් net accounting. දැන් restriction දාලා approval දෙන්නේ නැහැ 5KW වඩා.
     

    kingcapton

    Well-known member
  • Sep 28, 2012
    5,368
    6,535
    113
    3 phase wala meters 3k denawa gedarata , ethakota bill wenne 3k widiyata , example widiyata 3 floor gedarakata single phase (1 wire - 1 meter) aran use karaddi monthly units 300k yanawa kiyamuko example widiyata

    ethakota bill eka thama me


    View attachment 253368

    dan e floors 3nata , phase 3kin or 1 phase x 3 lines (3 meters) gaththama bill eka 3 x 100 units wage watenne (equal balance unoth) , ethakota ena bill eka thama me

    View attachment 253369

    Total = ~2500 x 3 = ~7500 LKR

    kohomath CEB eken godak area walata 3 phase service denna puluwan widiyata wire karala thiyenne , eken thama eyala gewal walata pahase maru kara kara wire supply denna


    Ex:

    Home A - 1st wire
    Home B - 2nd wire
    Home C - 3rd wire
    Home D - 4th wire

    me seen eka nisa thama powercut walata samahra ayeata power thiyanawa samaharunta naththe , godak welawata 2 floors gewal walata phase 2kin denne , ethakota ground floor powercut unama 1st ekata godak welawata thiyanawa
    ape 3 phase, single meter.
     

    Rick Sanchezz

    Well-known member
  • Dec 19, 2020
    7,244
    11,156
    113
    ඉස්සර ඉඳන් 5KW - CEB, 6/7KW Leco limit එක තියෙන්නේ single phase 30A එකට දෙන්න පුළුවන් උපරිම ගාන නිසා .
    ගෙදරට three phase 30 A - 20KW, 60A - 42KW උපරිම ගහන්න පුළුවන් මෝඩ ජෙපි ආණ්ඩුව එන්න කලින් net accounting. දැන් restriction දාලා approval දෙන්නේ නැහැ 5KW වඩා.
    three phase nam denut approval eka denawa 40KW max, but net plus only.

    යට තට්ටුවෙ කාමර 2යි, උඩ එකේ කාමර 3යි. යට එකට single අරන් උඩ එකට 3phase ගත්තානම් හරි වගේ නේ. වහල 1500sqft තියෙනවා, මම බැලුවෙ ගෙවල් දෙකට 10kw ගානෙ බෙදලා දෙන්න
    uda, yata 2kema wiring eka three phase nam 10KW use karanna puluwan net plus, hebei ehema seperately 10kw, 2k gahanawata wadaa laabai ubat 20kw thani ekak gahana eka. expertslagen poddak ahala balapan.

    3 phase wala meters 3k denawa gedarata , ethakota bill wenne 3k widiyata , example widiyata 3 floor gedarakata single phase (1 wire - 1 meter) aran use karaddi monthly units 300k yanawa kiyamuko example widiyata

    ethakota bill eka thama me


    View attachment 253368

    dan e floors 3nata , phase 3kin or 1 phase x 3 lines (3 meters) gaththama bill eka 3 x 100 units wage watenne (equal balance unoth) , ethakota ena bill eka thama me

    View attachment 253369

    Total = ~2500 x 3 = ~7500 LKR

    kohomath CEB eken godak area walata 3 phase service denna puluwan widiyata wire karala thiyenne , eken thama eyala gewal walata pahase maru kara kara wire supply denna


    Ex:

    Home A - 1st wire
    Home B - 2nd wire
    Home C - 3rd wire
    Home D - 4th wire

    me seen eka nisa thama powercut walata samahra ayeata power thiyanawa samaharunta naththe , godak welawata 2 floors gewal walata phase 2kin denne , ethakota ground floor powercut unama 1st ekata godak welawata thiyanawa

    ape gedara 3 phase, kalin meter 3k tibbe. but seperate bill 3k nam hamaba une neha. mun reading 3 aragena ekatu karala total bill eka dunne. Parana bill ekak aran balanna eke tiyenawa wenama meters wala gaana danna. Passe un awilla parana meter tika ain karala digital meter ekak demma.
     

    AnuradhaRa

    Well-known member
  • ape gedara 3 phase, kalin meter 3k tibbe. but seperate bill 3k nam hamaba une neha. mun reading 3 aragena ekatu karala total bill eka dunne. Parana bill ekak aran balanna eke tiyenawa wenama meters wala gaana danna. Passe un awilla parana meter tika ain karala digital meter ekak demma.
    එතකොට ඒ වාසියත් නැතුව යනව නේද..
     

    Rick Sanchezz

    Well-known member
  • Dec 19, 2020
    7,244
    11,156
    113
    එතකොට ඒ වාසියත් නැතුව යනව නේද..
    ow, ehema bill eka nam reduce une neha(oke 3 phase use karanakota load eka adu nisa adu wena kathawak ahala tyenawa). hebei power breakdown ekakadi 1 phase ekaka light neti wenakota anith phase 2ke light tiyena chance eka nam tiyenawa. 😅😅
     

    gcloud

    Well-known member
  • Mar 29, 2018
    1,161
    858
    113
    three phase nam denut approval eka denawa 40KW max, but net plus only.


    uda, yata 2kema wiring eka three phase nam 10KW use karanna puluwan net plus, hebei ehema seperately 10kw, 2k gahanawata wadaa laabai ubat 20kw thani ekak gahana eka. expertslagen poddak ahala balapan.



    ape gedara 3 phase, kalin meter 3k tibbe. but seperate bill 3k nam hamaba une neha. mun reading 3 aragena ekatu karala total bill eka dunne. Parana bill ekak aran balanna eke tiyenawa wenama meters wala gaana danna. Passe un awilla parana meter tika ain karala digital meter ekak demma.
    ethakota bill eka adu wime wasiya nethi wenawa neda?

    How three phase effect on EV vehicle charging?
     

    raman2

    Well-known member
  • Feb 16, 2009
    9,974
    12,059
    113
    3 phase wala meters 3k denawa gedarata , ethakota bill wenne 3k widiyata , example widiyata 3 floor gedarakata single phase (1 wire - 1 meter) aran use karaddi monthly units 300k yanawa kiyamuko example widiyata

    ethakota bill eka thama me


    View attachment 253368

    dan e floors 3nata , phase 3kin or 1 phase x 3 lines (3 meters) gaththama bill eka 3 x 100 units wage watenne (equal balance unoth) , ethakota ena bill eka thama me

    View attachment 253369

    Total = ~2500 x 3 = ~7500 LKR

    kohomath CEB eken godak area walata 3 phase service denna puluwan widiyata wire karala thiyenne , eken thama eyala gewal walata pahase maru kara kara wire supply denna


    Ex:

    Home A - 1st wire
    Home B - 2nd wire
    Home C - 3rd wire
    Home D - 4th wire

    me seen eka nisa thama powercut walata samahra ayeata power thiyanawa samaharunta naththe , godak welawata 2 floors gewal walata phase 2kin denne , ethakota ground floor powercut unama 1st ekata godak welawata thiyanawa
    Ehema bila adu wenne na, ehenam hamoma 3 phases gani..
    3 phase high power equipment run karanna puluwan, 30A walata wadi simultaneous power usage ekak ganna puluwan wage ewa thama benifit..
    Habai rental eka wadi mathaka widiyata..
     

    FlashBoz

    Well-known member
  • Nov 10, 2016
    572
    448
    63
    Bill 3k enne na eka bill ekai enne 3phase walata.
    Uda thattu yata thattu kiyalath na. Meter board eka lagin distrtibute wela enne. Phase thunata wenama breakers enawa. Meter board ekata enakan wiring cost eka wadiy. Electrician cost ekath wadi. Ethanin ehata normal wiring ne yanne.

    EV walata supiri. Wahana 5k witara eka paara charge karaganna puluwan load weka wadi wenne nathuwa.

    Habai laga patha load eka balala samahara welawara transformer ekak danna wenawa. ehema unot eka gahanne idiama aine loku kanu gahala. Ethanadi ida tikak ekata loss wenawa. Ehema nathnam transformer eka thiyena thana idan wiring adinawa. Ewata loku cost ekak yanwa.
    Estimate ekak ganna puluwan CEB request karama.
    ------ Post added on Jul 8, 2025 at 9:31 AM
     

    kavindagk

    Well-known member
  • Dec 18, 2008
    988
    1,000
    93
    Colombo
    Ehema bila adu wenne na, ehenam hamoma 3 phases gani..
    3 phase high power equipment run karanna puluwan, 30A walata wadi simultaneous power usage ekak ganna puluwan wage ewa thama benifit..
    Habai rental eka wadi mathaka widiyata..

    eka thama mama mulinma damme, illana hema ekatama denne na kiyala, industrial 3phase related equipment or aththenma 3 phase oninam withrai denna

    industiral walata dena rate eka wenas doemstic wenas , mama example 1keta gaththe different 3 lines ganne senario ekak domestic waladi
     

    imhotep

    Well-known member
  • Mar 29, 2017
    14,864
    8
    35,452
    113
    යට තට්ටුවෙ කාමර 2යි, උඩ එකේ කාමර 3යි. යට එකට single අරන් උඩ එකට 3phase ගත්තානම් හරි වගේ නේ. වහල 1500sqft තියෙනවා, මම බැලුවෙ ගෙවල් දෙකට 10kw ගානෙ බෙදලා දෙන්න
    We have 3Φ power too.. But AFAIK anything more than 30A single phase or three phase used to fall under bulk supply category. Not sure whether these have changed recently but check.
     
    • Like
    Reactions: tharakaf