    yes I got professional support!
    The SE said 12mm is enough for 1st floor columns and beams coz the ground floor walls are 9" thick as he said 12mm enough to bare the weight of second slab as well. i have a roof top in my house. but i have seen some people are using 16mm
    now i have doubts..

    It depends machan. In my design I don't have enough walls in the middle of the house. I preferred the house to be having less walls. So my Engineer used 18 x 9 beams and 16 mm tor steel to bear the load of the slab. If you have enough walls to support the slab beams, I don't see a fault in using 12 mm tor steel.

    By the way I had to bring the Engineer several times to the site to explain the mason how the tor to be tied and connected with others. Actually those designs are too much complicated for a ordinary mason to understand.

    Anyway due to continuous reference of those drawings, now I can read and suggest the best method even without the Engineer. LOL :lol:
     

    lodbrok

    Well-known member
  • Jul 9, 2016
    5,215
    7,007
    113
    🇬🇧
    It depends machan. In my design I don't have enough walls in the middle of the house. I preferred the house to be having less walls. So my Engineer used 18 x 9 beams and 16 mm tor steel to bear the load of the slab. If you have enough walls to support the slab beams, I don't see a fault in using 12 mm tor steel.

    By the way I had to bring the Engineer several times to the site to explain the mason how the tor to be tied and connected with others. Actually those designs are too much complicated for a ordinary mason to understand.

    Anyway due to continuous reference of those drawings, now I can read and suggest the best method even without the Engineer. LOL :lol:

    I was wondering why were you having such strong beams. I had the same sort of scenario 😊
     

    upulpdn

    Well-known member
  • Mar 13, 2009
    34,672
    2,251
    113
    Kurunegala
    It depends machan. In my design I don't have enough walls in the middle of the house. I preferred the house to be having less walls. So my Engineer used 18 x 9 beams and 16 mm tor steel to bear the load of the slab. If you have enough walls to support the slab beams, I don't see a fault in using 12 mm tor steel.

    By the way I had to bring the Engineer several times to the site to explain the mason how the tor to be tied and connected with others. Actually those designs are too much complicated for a ordinary mason to understand.

    Anyway due to continuous reference of those drawings, now I can read and suggest the best method even without the Engineer. LOL :lol:
    Congrats new S. Engineer :P
     

    dilshan87

    Well-known member
  • Apr 1, 2008
    11,196
    1
    6,250
    113
    Sri Lanka
    Really good work. That's how well planned persons.
    My father too has all details... Thart was by mid nineteen eighties...

    please add following details too...
    column sizes, how many floors, square foot area of house too...
    easy for comparison :yes:

    Not a problem machan. By the way I don't want to disclose my drawings of the house to the public. But I can give those details for sure.

    I maintain a Access Database for material purchases and labour payments. I raise a 3 ply voucher every time before I pay any advance to the masons. I copy is given to the mason, others are filed.

    I am doing the QS role myself. :P I am somewhat skilled in my mathematical knowledge and I measure the work done using my drawings' heights, length's and widths. Then I multiply it with their rates and pay them only for the work done. (I deduct all the duplication and get the exact work they have done)

    Colomns & Foundation


    • 12 mm Tor used Columns were laid on 3 x 3 ft footings which were excavated upto 5 feet, compacted by poker with quarry dust

    • 16 mm Tor used Columns were laid on 4 x 4 ft footings which were excavated upto 5 feet, compacted by poker with quarry dust
    • Footings were laid upon 2 inch screed concrete and connected with rubble foundation upto 2 ft. Upon Rubble, all were tied with a 9x9 plinth beam usin 12 mm Tor.
    My house is a two storied one with a 2nd floor terrace. Height goes upto 39 feet with the water tank.

    Total Sqft of the house is 2965 sqft with balconies and terrace.
     

    upulpdn

    Well-known member
  • Mar 13, 2009
    34,672
    2,251
    113
    Kurunegala
    Not a problem machan. By the way I don't want to disclose my drawings of the house to the public. But I can give those details for sure.

    I maintain a Access Database for material purchases and labour payments. I raise a 3 ply voucher every time before I pay any advance to the masons. I copy is given to the mason, others are filed.

    I am doing the QS role myself. :P I am somewhat skilled in my mathematical knowledge and I measure the work done using my drawings' heights, length's and widths. Then I multiply it with their rates and pay them only for the work done. (I deduct all the duplication and get the exact work they have done)

    Colomns & Foundation


    • 12 mm Tor used Columns were laid on 3 x 3 ft footings which were excavated upto 5 feet, compacted by poker with quarry dust

    • 16 mm Tor used Columns were laid on 4 x 4 ft footings which were excavated upto 5 feet, compacted by poker with quarry dust
    • Footings were laid upon 2 inch screed concrete and connected with rubble foundation upto 2 ft. Upon Rubble, all were tied with a 9x9 plinth beam usin 12 mm Tor.
    My house is a two storied one with a 2nd floor terrace. Height goes upto 39 feet with the water tank.

    Total Sqft of the house is 2965 sqft with balconies and terrace.

    ok :yes:
    👍
    18 columns and may be 1500 sqft ground floor....

     

    lodbrok

    Well-known member
  • Jul 9, 2016
    5,215
    7,007
    113
    🇬🇧
    kohenda hala balanne??:baffled:
    😂
    Try these numbers and explain them that you are looking for a contractor. They might be able to help you.


    ernJcuT.png
     

    nikdw

    Well-known member
  • Jul 17, 2016
    10,276
    4,966
    113
    normally 2 stories geyak hadanna kochara kalayak yanwada ban? roughly 2000 squremeter wage?
     

    lodbrok

    Well-known member
  • Jul 9, 2016
    5,215
    7,007
    113
    🇬🇧
    normally 2 stories geyak hadanna kochara kalayak yanwada ban? roughly 2000 squremeter wage?

    That's a quite difficult question to answer. The answer depends on loads of factors but if you insist to give a number I would go for 6 months.
     

    Cee7

    Well-known member
  • Dec 8, 2008
    3,278
    1,578
    113
    LK
    මචන් සිමෙන්ති වලට ගල්කුඩු දාන්න හොදයිද වැලි සමග හරි ⁣වැලි වෙනුවට හරි
     

    upulpdn

    Well-known member
  • Mar 13, 2009
    34,672
    2,251
    113
    Kurunegala
    මචන් සිමෙන්ති වලට ගල්කුඩු දාන්න හොදයිද වැලි සමග හරි ⁣වැලි වෙනුවට හරි
    wali keta wala size neweyine. piti wagene... concrete eke strength adu wenawa adhala anuptha waladi
     